MAX IV Combines High-Tech Laboratory with High-Tech Sustainability

MAX IV is a world-leading accelerator physics laboratory for research into synchrotron radiation. It is also unique in its ambitious sustainability aims. Its smart solutions in energy efficiency, biological diversity and waste management make it the first building to receive the BREEAM-SE environmental classification.

MAX IV is a world-leading facility in the field of accelerator physics that is available for use by scientists from universities and industry around the world. It also houses research projects in biology, physics, chemistry and environmental science, as well as geology, engineering and pharmacology. What’s more, MAX IV is at the centre of an emerging city district in northern Lund. Once the district is complete, a total of 50,000 people will live and work in the area, which is also home to the ESS research facility and Science Village. This means that MAX IV will have a significant impact on the city of Lund and its 125,000 residents.

The exciting high-tech research projects taking place here haven’t stopped MAX IV from also focusing on making the facility as sustainable as possible. For instance, it reuses energy from renewable resources, recycling the excess heat via the city’s district heating system and, in exchange, receiving cooling water for its accelerator equipment.

Reusing heat in the district heating network

MAX IV’s cooling system includes three different systems at different temperatures. The system with the lowest temperature is primarily used for cooling buildings and server rooms. The second-coolest system is used for cooling parts of the scientific equipment and maintaining a stable temperature in the accelerator building. Finally, the system with the highest temperature is used for supplying heat to the plant. All of the heat that’s removed by the cooling systems is reused in Lund’s district heating network. Since 2019, some of the heat has been reused in the world’s largest low-temperature district heating network, described in a separate article on this website.

Several sustainability classifications

Besides the heating and cooling systems, the facility has LED lights in all buildings, controlled ventilation, green roofs, solutions for storing and delaying storm water, and has made environmental improvements to support local wildlife. The construction process itself was designed to meet ambitious environmental goals such as low energy consumption, minimum waste and waste management. As a result, MAX IV has attained Green Building, Miljöbyggnad Guld and BREEAM Outstanding certification, and it was the first building to receive the BREEAM-SE classification.

Ensuring biological diversity on site

The sustainability ambitions include not only the buildings but also their surroundings. To ensure the area can be used for farming once the synchrotron laboratory is decommissioned, the building process included a ‘cut-and-fill’ strategy. All excavated material has been kept on site and used to create varied landscaping with hills and slopes, which also prevents vibrations in the ground that could have an influence on experiments.

To boost the biological diversity of the site, the slopes have been sown with a mix of seeds from the nearby nature reserve, and rainwater ponds with wetland vegetation have been constructed. These nature-based solutions are designed to store and delay storm water from both annually recurring storms and once-in-a-century storms.

The national MAX IV laboratory is hosted by Lund University and its main funder is the Swedish Research Council. It’s an interesting example of creating a high-tech environment with sustainability at the heart of the research, facilities and the surrounding infrastructure.


Similar Best Practices

Tvärpilen – a small residential area, big on sustainability

Tvärpilen – a small residential area, big on sustainability

In the small village, Kivik, in the southeast of Sweden, you find the new residential area, Tvärpilen, where the Beautiful, the Sustainable and the Responsible come together in perfect combination.

Fossil-free steel demonstration plant in Vitåfors (Gällivare)  – direct reduction of iron ore pellets with hydrogen

Fossil-free steel demonstration plant in Vitåfors (Gällivare) – direct reduction of iron ore pellets with hydrogen

HYBRIT’s demonstration plant in Vitåfors will demonstrate the value chain for fossil-free steel on an industrial scale. It includes production of hydrogen and of sponge iron by direct reduction with hydrogen. The plant is planned to be ready in 2026.

Fossil-free steel pilot plant in Luleå – direct reduction of iron ore pellets with hydrogen

Fossil-free steel pilot plant in Luleå – direct reduction of iron ore pellets with hydrogen

HYBRIT is conducting trials on direct reduction of iron ore pellets, using hydrogen produced by fossil-free electricity. HYBRIT is also building a pilot hydrogen storage to test the best way to store hydrogen underground.

Haraholmen – a green industrial park where sustainability is key

Haraholmen – a green industrial park where sustainability is key

Haraholmen is an industrial park where sustainability is key. The site uses renewable energy, welcomes companies with green profiles, and is a hub for resource-efficient transportation with access to roads, railways, and a deep-water port.

Markbygden 1101 – Europe’s largest onshore wind farm

Markbygden 1101 – Europe’s largest onshore wind farm

Markbygden 1101 is the largest onshore wind power project in Europe. Once completed, it will consist of up to 1101 wind turbines that together will produce up to 12 TWh per year. This is comparable with around 8% of Sweden’s electricity production.

Site East –  a climate neutral construction site

Site East – a climate neutral construction site

At Skellefteå Site East, close to Northvolt’s factory, conditions are created to create the most sustainable development project ever. By maximizing the cutting edge know-how of both Skellefteå municipality and external partners, Skellefteå Site East is a source of inspiration for the industry. Both in terms of the courage to dare to think and act in new ways around sustainability, and in working together with contractors towards a common vision.

Skellefteå Airport – a green airport

Skellefteå Airport – a green airport

At a time when the global aviation sector is facing increasing demands to get on a sustainable flightpath, one airport in northern Sweden has gotten a head start with an extensive vision that has led them to become one of Europe’s and probably the world’s first fossil-free airport. At the same time the airport is now preparing to become a testcenter for electric powered and vertical-starting aircrafts.

Blue Green City Lab evaluates blue green solutions

Blue Green City Lab evaluates blue green solutions

In times of more extreme weather caused by climate changes the downside with dense cities with fewer green spaces and more paved surfaces is showing. Extreme heat, flooding and reduced biodiversity, we all see it. However, blue green solutions have a positive impact. Blue Green City Lab is the testbed that evaluates new and proven solutions.

Siptex – Groundbreaking Textile Sorting

Siptex – Groundbreaking Textile Sorting

Siptex is the world’s first large-scale facility of its kind. It sorts textiles by colour and fibre composition using near-infrared light, allowing it to handle large flows and produce textile fractions suited to different recycling processes.

Augustenborg Botanical Roof Garden

Augustenborg Botanical Roof Garden

With its 9500 sqm the Botanical Roof Garden of Augustenborg is an ever-evolving testbed of urban greening. Here you get to see more than 20 different solutions for greening a rooftop, from the most extensive green roofs to biosolar solutions and even a rooftop kitchen garden.

CoordiNet – Exploring the Possibilities of a Flexible Power Market

CoordiNet – Exploring the Possibilities of a Flexible Power Market

The CoordiNet project is exploring the benefits of creating a ‘power flexibility market’. When electricity demand is high, market participants can offer to reduce their electricity use or increase electricity production and sell excess power to the grid operator.

Sweden’s largest battery storage – a front-edge project to meet increasing electricity demand

Sweden’s largest battery storage – a front-edge project to meet increasing electricity demand

Many cities around the world are growing rapidly, which increases the need for electricity. In the city of Uppsala, Sweden, a possible solution is being developed, piloting one of Sweden’s largest battery storages to meet the increased demand, enable continued expansion and mitigate increased capacity needs.